Install the canopy, 4c 4b – LBL Lighting Duke Grande User Manual

Page 3

Advertising
background image

3

Install the Canopy

4A

4"

Leave 6" of the cord behind the canopy for power
connections. Cut the excess cord.

From the end of the cord, strip the insulation 4" using a
sharp knife.

.

Make sure not to nick the inner wires

Strip the end of the wires.

7

1

7

2

7

3

10

2

4

2

5

Install the secondary strain relief by first feeding the
power cord through it.

Snap the strain relief tab into place.

Pull the cord to take up the slack and fit the rest of the
cord in the strain relief’s openings.

2

6

10

2

7

2

8

2

9

Connect the red driver wire to the appropriate insulated
pendant wires.

Connect the yellow driver wire to the appropriate
insulated pendant wire.

Connect the fixture and the crossbar ground wire to a
suitable ground in accordance with local electrical
codes.

Connect the white driver wire to the neutral power line
wire.

Connect the black driver wire to the hot power line
wire.

2

10

2

11

4

5

6

6

TAB

4C

4B

10

8

7

9

11

DRIVER

Advertising
This manual is related to the following products: