Install the cable post – LBL Lighting Scarlett SD User Manual

Page 3

Advertising
background image

3

Place all wires and wire nut connections properly inside
the electrical box.

Loosen the set screw on the primary strain relief.

Align the canopy center hole with the crossbar center
hole.

Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the
crossbar. Do not turn the cord.

Push the cord into the canopy and line up the marked
point on the cord with the bottom of the primary strain
relief.

Tighten the plastic set screw to secure the cord.

STRAIN RELIEF

CORD

SET SCREW

3C

6

7

8

9

10

11

Install the Cable Post

4A

7

1

Mark the cable post location point 30.56” away from the

center cable clutch on the canopy.

CABLE CLUTCH

CAUTION:

Make sure to support the fixture while

installing, an assistant will be needed to complete
the remaining steps.

30.56”

CABLE POST LOCATION

Screw the anchor in the rest of the way with a Phillips

screwdriver.

4C

7

3

3

4B

7

2

Tap the anchor at the marked point up to the threaded portion

with a hammer.

ANCHOR

2

CEILING

3B

10

2

2

2

3

2

4

Reconnect the power cord wires to their original connections

(reversal of 2A).

Ground the fixture to a suitable ground in accordance
with local electrical codes.

Connect the white ballast wire to the neutral power line
wire.

Connect the black ballast wire to the hot power line
wire.

5

4

5

3

2

2

3

Advertising