Save these instructions – LBL Lighting Scarlett SD User Manual

Page 4

Advertising
background image

4

Screw the cable post completely to the threaded nipple.

CABLE POST

THREADED NIPPLE

4E

5

5

6

Feed the cable through the cable post.

To level the fixture, push the tab on the cable clutch and feed

more or less of the support cable into the cable clutch. Make

fine adjustments to each cable until the fixture is level.

Trim the excess cable from the cable post.

CAUTION:

Make sure to support the fixture while

making adjustments, an assistant will be needed to
complete this step.

4F

7

CABLE
CLUTCH

8

CABLE CLUTCH

7

SAVE THESE INSTRUCTIONS!

7400 Linder Ave, Skokie, IL 60077

800.323.3226 - 847.626.6300

www.lbllighting.com

© 2013 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.

A Generation Brands Company

CABLE POST

8

7

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple in place.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

4D

7

4

4

Advertising