Adjust standoff height (optional), Install the 2-circuit monorail, 2a 1a 3a – LBL Lighting Standoff Ball Joint Assembly User Manual
Page 3: 1a 3b
![background image](/manuals/415529/3/background.png)
3
Adjust Standoff Height (Optional)
Slightly loosen
the M3 set screw on the
(Do Not Remove)
side of the telescoping post with th 1.5 MM Allen wrench
provided.
Adjust standoff height and tighten M3 set screw with 1.5 MM
Allen wrench.
Repeat steps 1 and 2 for the remaining standoffs.
M3 SET
SCREW
1.5MM ALLEN
WRENCH
TELESCOPING POST
Install the 2-Circuit Monorail
Remove the housing cap on all standoffs.
1
HOUSING CAP
Place a section of the 2-Circuit Monorail into standoff
housings.
While supporting the 2-Circuit Monorail, tighten the housing
cap completely to the standoff housings to secure the
2-Circuit Monorail in place.
Repeat steps 2 and 3 for remaining standoffs.
2-CIRCUIT MONORAIL
NOTE:
In case of cross threading, loosen the cap and
repeat step 3.
STANDOFF HOUSING
HOUSING CAP
1A
1
2A
1A
3A
1
1A
3B
1
2
3
2
3
2
3
4