Weems and Plath Endurance II 135 Barometer/Thermometer User Manual

Page 4

Advertising
background image

II. Installation Instructions

All instruments can be mounted in one of two ways:

1) Instruments can be screwed in place on a wall or boat bulkhead using the

enclosed screws and mounting template.

a. Poke holes in the indicated drill holes on the paper template

diagram.
b.

Place the template on the wall or bulkhead in the place you

want to install the instrument. Tape it to wall if helpful.

c. Use a bubble level along the horizontal dotted line or hang a

plumb line along the vertical dotted line to be sure placement is level.

d. Once correctly positioned, mark the wall through the template

holes with a pencil or screwdriver.

e. Remove the paper from wall and drill pilot holes with a 1/8 inch

or 3.5mm drill bit.

f. Place the black rubber vibration isolation gasket between the

back of the instrument and the boat bulkhead to absorb

vibrations. This mounting gasket also ensures that the

wall/bulkhead is protected from marks.

g. Secure the instrument using a philips head screwdriver and the

stainless steel screws provided.
2) Instrument can be mounted on a wall using the keyhole slot located

on the backside of the instrument. Secure one of the provided screws

partially into the wall in desired location. Place keyhole slot over screw

to hang. (Not recommended for boat mounting.)

3

Advertising