Hot aisle containment, Installation instructions – Chatsworth Products Hot Aisle Containment User Manual
Page 10
Advertising
HOT AISLE CONTAINMENT
Page 10 of 23
Installation Instructions
Containment Structure Assembly Sequence (7/9) :
13. The Vertical Extrusion of the lateral should be cut 3.25 inches (83 mm) less than the
cabinet to Roof distance to accommodate for the upper extrusion.
14. Install Extrusion vertically at the each end of Row length Extrusion and End width
Extrusion with Gusset plate using 3/8”-16UNC Screws (Fig. 12).
Row length
Extrusion
End Width
Extrusion
Gusset Plate
3/8”-16UNC
Screw
Vertical
Extrusion
Fig. 12
Advertising