Hot aisle containment, Installation instructions – Chatsworth Products Hot Aisle Containment User Manual
Page 11

HOT AISLE CONTAINMENT
Page 11 of 23
Installation Instructions
Containment Structure Assembly Sequence (8/9) :
15. Loosely install the Vertical extrusion to convenient location approximately
equal distance along the containment row length. Each Vertical extrusion should
have minimum two gusset plate with 3/8”-16UNC screws (Fig. 13).
16. Install extrusion across the containment row length at alternate vertical
extrusion on bottom rectangle containment. Each extrusion length should be
equal to end width of extrusion.
17. Each adjacent extrusion should have minimum three gusset plate with 3/8”-
16UNC screw. (Fig.14).
Fig. 13
Fig. 14
Row length
Extrusion
Vertical
Extrusion
Gusset
plate
Vertical
Extrusion
Containment
Row length
Extrusion
Adjacent
Extrusion
Gusset plate
3/8”-16UNC
screw