Installation, Total power off procedure, Operating environment – American Power Conversion 250 A User Manual

Page 13

Advertising
background image

Warnings

InfraStruXure Power Generation System

3

Installation

Install the ATS in accordance with the National Electrical Code (NFPA 75) in the United States, or in

accordance with the Canadian Electrical Code (CSA C22.1-02) in Canada.

When connecting Source 1 power to the ATS, install an external circuit breaker to protect against

over-current conditions. The external circuit breaker must be rated at 250 A, with a symmetrical

ampere rating of 35,000 rms.

Total power off procedure

To reduce the risk of electric shock or injury to personnel, disconnect all sources of power supply

before servicing. To disconnect all sources of supply, follow this procedure:

1. Set the Automatic Operation