Allied Telesis SwitchBlade x3106 User Manual
Page 105
Advertising

SwitchBlade x3106 Installation Guide
105
4. Check the model name, shown in Figure 60, to verify the module.
If you have the AT-SBxPWRSYS1 AC System Power Supply, do not
continue with this procedure. Instead, perform “Installing the AT-
SBxPWRSYS1 AC System Power Supply” on page 97.
Figure 60. Verifying the AT-SBxPWRPOE1 AC Power Supply
5. Raise the locking handle on the AT-SBxPWRPOE1 AC Power Supply,
as shown Figure 61.
Figure 61. Raising the Handle on the AT-SBxPWRPOE1 AC Power
Supply
6. Align and insert the AT-SBxPWRPOE1 Module into slot A or B. Figure
62 on page 106 shows the power supply being installed in slot A.
Caution
The AT-SBxPWRPOE1 AC Power Supply will not work in slot C or
D.
Advertising