Unpacking the switch – Allied Telesis AT-GS908 User Manual
Page 27

AT-GS908 Gigabit Ethernet Switch Installation Guide
17
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.
2. Place the switch on a level, secure surface.
3. Ensure the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesyn sales representative for assistance.
One AT-GS908 Gigabit Ethernet switch
Two mounting brackets
Six bracketmounting screws
Four rackmounting screws
Four rubber feet (for desktop use only)
Power cord (Americas, EC, Australia, and UK only)
This installation guide
Warranty card