Swiftech H20 220 T User Manual

Page 16

Advertising
background image

4. MCW5002-64T™ THERMOELECTRIC WATER-BLOCK INSTALLATION GUIDE FOR AMD ATHLON 64,

OPTERON (SOCKET 754, 939, 940)

Figure 1



Preamble

The following instructions are crucial to long lasting & reliable operations. Do not skip these steps, and do not take shortcuts.
Permanent damage to your components is likely to occur otherwise.

A. Condensation prevention measures: Motherboard preparation

Copyright Swiftech 2005 – All rights reserved – Last revision date: 12-27-05 - Information subject to change without notice – URL:

http://www.swiftnets.com

Rouchon Industries, Inc., dba Swiftech – 1703 E. 28

th

Street, Signal Hill, CA 90755 – Tel. 562-595-8009 – Fax 562-595-8769 - E Mail: [email protected]

PAGE 16 of 32

Conformal coating application: This step will positively ensure that any micro condensation occurring on small surface mount
components will not corrode or short-circuit the motherboard. Please use the included conformal coating spray.

Advertising