PerTronix JBA Exhaust 40-1534 User Manual

Installation instructions

Advertising
background image

INSTALLATION INSTRUCTIONS

Start:

1. Remove and inventory new JBA exhaust

system.

2. Disconnect negative battery cable and

allow vehicle to cool.

**Installation recommendation:

JBA recommends in most cases that the vehicle be taken to a reputable exhaust shop.
40-1534
2005 Dodge Dakota 4.7L

Quad Cab / Short Bed

TOOLS RECOMMENDED:

15mm wrench or socket

9/16 socket

mallet

spray lubricant or penetrating oil

pry bar

A

B

C

D

F

E

Parts List
A. Intermediate pipe w/ hanger 1
B. JBA high flow muffler

1

C. Tail pipe with hangers

1

D. Turn out with tip

1

E. 2-1/2” Clamp

1

F. 3” Clamp

3

3. With the vehicle raised and properly

supported, loosen the band clamps on the

exhaust using a 15mm wrench.

4. Disconnect the ground strap from the

exhaust.

5. Spray lubricant on the exhaust hangers.

6. Using a pry bar, pry the exhaust to

remove hangers.

Use caution.

7. Remove the exhaust system from the

vehicle.

8. Slip the supplied 2-1/2” clamp (E) over

the end of the catalytic converter assembly.

9. Slide the intermediate pipe (A) over the

end of the catalytic converter assembly.

Align the key with the notch on the interme-

diate pipe.

10. Slip 2.5” clamp (E) over intermediate

pipe (A) connection with catalytic converter

assembly and tighten using 9/16 wrench.

11. Spay lubricant on the forward rubber

grommet and slip Intermediate hanger (A)

in grommet.

12. Slip 3” clamp w/ hanger (F) onto inter-

mediate pipe (A). Then slip JBA muffler (B)

on to intermediate pipe (A)

13. Install 3” clamp (F) over connection with

muffler (B) and secure.

14. Spray lube on tail pipe hangers (C).

Insert hangers into rear grommet . Then slip

tail pipe (C) in to rear of muffler (B). Make

sure tail pipe is aligned properly and secure

to muffler with 3” clamp (F).

15. Slip 3” clamp (F) over end of tail pipe

(C). Install turn out with tip (D) on to tail

pipe (C).

16. Align the turn out with tip (D) for proper

clearance from fender and spare tire. Se-

cure in place with 3” clamp (F) and tighten.

17. Using a soft cloth, remove all prints

from exhaust tip.

18. Check all clamps and connections for

proper fit and alignment. Double check all

clamps are tightened and that all hangers

are secure in rubber grommets. It is recom-

mended that after installation of the exhaust

system you have all slip connections tack

welded by a muffler shop.

NOTES:

1. It may be necessary to loosen and

realign the spare tire for proper clearance.

2. All exhaust systems expand about 1”

rearward when exhaust temperature rises.

3. Use anti-seize on threads of clamps.

JBA recommends taking the vehicle to a muffler shop and having all slip connections tack welded.

11.10.06

F

F

Other recommended products:

Get more power and efficiency with a set of

smog legal JBA Cat4ward® headers.

Part No. 1949S-2

05-06 Dakota 4.7L

Advertising