American Dryer Corp. Gas DSI/Electric/ Steam AD-78 II User Manual

Page 38

Advertising
background image

34

5. Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bar), steam damper
operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to
check steam damper system operation. If damper air adjustment is necessary, locate flow control valve and
make the necessary adjustments as noted below.

Advertising