American Dryer Corp. Gas DSI/Electric/ Steam AD-78 II User Manual
Page 71
Advertising

67
SECTION X
PROCEDURE FOR FUNCTIONAL CHECK
OF REPLACEMENT COMPONENTS
1. Microprocessor Controller (Computer) Board
a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish
power to the dryer.
b. Start the drying cycle.
c. Verify that the motors, heat, and the heat indicator dots, in the microprocessor controller (computer) light
emitting diode (L.E.D.) display are on. (Refer to the illustration below.)
d. Verify that the motors, heat, and door indicator lights on the back side of the microprocessor controller
(computer) board are lit. (Refer to the illustration below.)
Advertising
See also other documents in the category American Dryer Corp. Dryers:
- SL2929 (8 pages)
- AD-15 Phase 7 (31 pages)
- ML-75DIII (65 pages)
- AD-236 (33 pages)
- AD-50V (61 pages)
- ML-96HS (38 pages)
- 75 lb (6 pages)
- SL2020 (8 pages)
- AD-758DV (52 pages)
- Aquatex AD-76 (36 pages)
- MDG-75 (66 pages)
- MLG-130DR (HSI) (45 pages)
- MLG31PCB (44 pages)
- AD-410 (72 pages)
- AD-75THS (49 pages)
- Direct Spark Ignition ADG-530DSi II (33 pages)
- MLG32PD3 (39 pages)
- ML-55 (52 pages)
- ML-96 (34 pages)
- ADG-410 (75 pages)
- ADG-320D (53 pages)
- Phase 7 Gas/Steam AD-464 (62 pages)
- AD-120ES (50 pages)
- Gas/Electric/Steam ML-55HS (56 pages)
- AD-840 (47 pages)
- MDG31 (26 pages)
- D20 (37 pages)
- Aquatex AD-52 (37 pages)
- Phase 7 D30 (39 pages)
- 30 lb. Stacked Models (26 pages)
- ADH-120 (46 pages)
- ML-96D (43 pages)
- Super AD-50 (54 pages)
- ML-122 (52 pages)
- SL31 (12 pages)
- Super AD-30 (63 pages)
- MDG30V (52 pages)
- AD-670 (60 pages)
- SL31AD-15 (72 pages)
- ADS-464 II (80 pages)
- ML-190 (42 pages)
- Heat Reclaimer AD-170HR (20 pages)
- 50 lb. Single Pocket MDG50V (52 pages)
- 24 VAC Phase 5 AD-330 (40 pages)
- D75 (42 pages)