Verifying system requirements, Verifying the configuration, Verifying the electrical requirements – Power Soak 35351 Skewer Soak INstallation Manual User Manual

Page 6

Advertising
background image

2

Verifying System Requirements

Prior to completely removing the Skewer Soak unit from the crate, it is necessary
to verify certain requirements. Remove

only the lid

of the crate at this time.

Verifying the Configuration

The Skewer Soak can be built as a “Left to Right” or as a “Right to Left”
configuration with a variety of options. Look inside the crate and verify that
the configuration of the machine matches the specifications of the order
description.

Verifying the Electrical Requirements

The electrical requirements for the machine are on the machine
identification tag located on the side of the wash tank, next to the motor.
The electrical service in the facility where the machine is to be installed
must be rated for the capacity shown on the identification tag.

LEFT TO RIGHT UNIT

RIGHT TO LEFT UNIT

Advertising