6.5 Electrical Wiring

W

HILE THE

ECA

WIRING REQUIREMENTS ARE VERY SIMPLE

,

ALWAYS KEEP IN MIND THAT ACCESS

TO THESE CONNECTORS REQUIRES THE REMOVAL OF THE COVER

,

AND AS SUCH THIS PROCEDURE

SHOULD ONLY BE PERFORMED BY A TRAINED PROFESSIONAL

.

Wait a minimum of 3 minutes after disconnecting power before servicing the ECA or
pump motor. Capacitors retain a charge even after power is removed from the controller.

It is highly recommended that you take a step-by-step approach to wiring and confirming proper
ECA operation:

1. Make the Line voltage connections. These will allow you to operate the ECA and

attached Pulsafeeder pump.

2. Decide which low voltage Inputs and Outputs (e.g., 4-20mA in) will be used and make

those connections

3. Power-up and test the ECA to confirm the connections and check for proper operation.


6.6 Power Wiring Information

T

HESE PROCEDURES REQUIRE REMOVAL OF THE ENCLOSURE COVER

.

T

HIS SHOULD BE DONE ONLY IF

THE AREA IS KNOWN TO BE SAFE FOR ELECTRONIC WORK

.

• Verify the correct supply voltage (115VAC or 230VAC) with the nameplate affixed to

your ECA. Ensure that your supply voltage matches the ECA configuration.

• Wires should be routed within the enclosure in a manner that maintains separation

between line voltage and extra-low voltage conductors.

• Applicable national and local electrical codes take precedence over

recommendations in the table below.

• A circuit breaker or fuse must be provided as noted below.

11