2 tests, 3 replacement, 4 cables – Beijer Electronics iX TxA EN User Manual
Page 11: Tests, Replacement, Cables

TxA Maintenance
3.2.2
Tests
The manufacturer performs extensive hardware testing before an operator panel
is approved. Some tests are performed by external testing companies, such as the
Swedish National Testing and Research Institute.
All operator panels are submitted to testing before leaving the manufacturer.
3.2.3
Replacement
This section contains instructions on how to replace operator panel hardware.
Only components included in the latest bill of material and spare parts list are
allowed.
3.2.4
Cables
Most of the operator panels use the same type of flex cable connectors.
To release the flex cables from the connector, gently push the two flanges on the
cable connector towards the flex cable, or in some cases, a clip above the complete
connector.
connector flanges
Caution:
The connectors must be unlocked on both sides before removing the cable, otherwise
the flex cable may be damaged.
Beijer Electronics, MAEN021
11