8 battery, Battery, Selftest and software update after hardware change – Beijer Electronics iX TxA EN User Manual
Page 17

TxA Maintenance
3.2.8
Battery
The panels listed below use a rechargeable battery. All other panels use a BR 2032
battery.
Panels with part numbers 630000101, 630000201
and 630000301:
When connecting the operator panel to the power outlet for the first time, make
sure not to interrupt power for a minimum of 48 hours in order to charge the
battery completely. After that, the battery may be charged partly during a shorter
period of time.
3.2.9
Selftest and Software Update af-
ter hardware change
It is important and recommended that the panel is tested after a change of
hardware has been made.
To do so, a software update has to be made and after that the selftest program with
the connected test-plugs has to be performed.
Note:
Please refer to chapter
and the iX Developer online help.
Beijer Electronics, MAEN021
17