Fypon QuickPost and Durapoly Posts User Manual

Synthetic porch posts, Installation instructions, Important information

Advertising
background image

Tools Required

Need help? 1.800.446.3040

www.fypon.com

Synthetic Porch Posts

Installation Instructions

Reciprocating Saw

Drill

Level

Circular Saw

Screwdriver

Tape Measure

Plumb Line

Before You Begin:

Important Information

When installing QuickRail

railing to the post, pre-drill

holes for bracket screws using a

1

/

8

" drill bit.

QuickPost

and DuraPoly Post

Load Bearing Capacity: 5" = 2,500 lbs.;

6" = 5,000 lbs.

Important Information for Painting

Do not use paint or solvents with acetone.

Oil based primer and paint are not recommended. Krylon

®

Fusion

®

paint for plastics

is an alternative to exterior latex.

Do not paint using dark colors (dark colors are considered any color that falls within

the L values of 56 to 0). L is a measure of the lightness of an object, and ranges
from 0 (black) to 100 (white). Doing so may void warranty.

Post Installation

Measure opening to determine post length. Deduct

3

/

8

" total to accommodate top and

bottom mounting plates.

For 36" QuickRail

railing: Do not trim more than 6" from the bottom of post,

trim balance from top.

For 42" QuickRail

railing: Do not trim the bottom of post, trim only the top.

Trim post. A reciprocating saw is recommended (be sure to wear personal protective
equipment). Be sure to match cut with same pitch as slope of floor.

Install bottom plate using 4 screws (provided). (The 8 screws provided will work for wood
or masonry applications. When installing screws into concrete, drill a

3

/

16

" pilot hole

1

/

4

"

deeper than the length of the screw.) Note: Be sure the location on the floor for the mount-
ing plate allows the load on the top of the post to be centered and evenly distributed. Using
a plumb tool, line up the ceiling plate with the floor plate by marking the location of at least
two holes from the floor plate on the ceiling. Secure ceiling plate with (4) screws when in
position.

After installation of plates, raise soffit approximately

1

/

2

". Set post on bottom plate. Position

top of post with top plate. Lower soffit on top of post. There is no need to screw post to
plate. IMPORTANT: If using a trim kit, slide onto top and bottom of post before post is in-
stalled into mounting plates. Check post with level and remove temporary support allowing
the top bracket to fit down on the top of the post.

Continued on next page

®

®

®

Figure

1

Personal Protective

Equipment

Hammer Drill with

3

/

16

" Concrete Bit

Warranty Information

Fypon warrants all QuickRail

products to be free from defects

in material and workmanship. For

complete warranty details, visit the

Product Support section at

www.fypon.com.

Advertising