Fypon Quick Rail Gate Kit User Manual

Gate kit, Installation instructions, Important information

Advertising
background image

Tools Required

Need help? 1.800.446.3040

www.fypon.com

Gate Kit

Installation Instructions

Level

Square

Personal Protective

Equipment

Screwdriver

Drill with #

1

/

8

Phillips

Head Bit

Tape Measure

Before You Begin:

Important Information

Gates are precut to fit a 37

1

/

2

" wide opening, but can

be trimmed for smaller applications. Be sure to check with local
building code officials for any dimension requirements.

Gate kits should only be used for applications that are no more than

30" above ground.

Gate Kit Installation

Insert spindles into precut holes on bottom rail.

Place top rail on spindles. This is best done by holding the rail at a slight upward angle
and inserting spindles one at a time into precut holes (

Figure 1).

With spindles in the top and bottom rails, slide rail ends into the precut holes of one of
the 4" x 4" sleeves. This is best done by laying sleeve on its side with the precut holes
facing up and placing rail ends into holes while applying pressure on the rails.

With the rail ends pointed up, slide the second 4" x 4" sleeve into place and stand gate
assembly upright with spindles vertical.

Make sure all rail ends are flat against the inside wall of the 4" x 4" sleeves. Before
proceeding to the next step, you may want to use some strap clamps to keep the gate
assembly together.

Secure the top and bottom rails in place by inserting one of the provided #10 x 1

1

/

4

"

Phillips Pan Head screws into the rail on the inside of the sleeve, directly beside the
precut hole in the sleeve. This is best done by drilling a

1

/

8

" pilot hole

3

/

16

" from the edge

of the sleeve in the center of the rail (

Figure 2). Do this on both sides of the top and

bottom rail.

Place the gate assembly on the ground and square it using a carpenter square or some
other method.

Mark the pre-drill holes at the locations indicated in Figure 3 using

1

/

8

" drill bit. Make

sure to drill through both the sleeve wall and the top rail wall (

Figure 3).

Use the provided #10 Phillips Pan Head screws and thread into the holes drilled
previously.

Turn the assembly over and repeat steps 9 & 10. A total of 8 screws should be used for
steps 9-11. This helps prevent the gate from sagging after it is mounted.

Measure and attach the gate hinge and latch at desired location using the provided #14
x

3

/

4

" Phillips Pan Head screws (making sure to pre-drill first using an

1

/

8

" drill bit). Note:

The gate hinges and latch must be secured and attached to the adjacent post sleeve
with structural wood support inside.

Attach taper caps with PVC glue. Note: The gate may need leveled periodically due to
changes in temperatures. This can be done by adjusting the hinges.

®

®

Figure

1

Figure

3

Figure

2

®

Warranty Information

Fypon warrants all QuickRail

products to be free from defects

in material and workmanship. For

complete warranty details, visit the

Product Support section at

www.fypon.com.

Advertising