3-WAY
TEE CONNECTION

10. Connect free end of mix pump hose to 3-way Tee
as shown in Figure D. When all connections are
complete the 3-way Tee must be lower than the
black pump housing.

D. Connect 1/2 inch (1.27 cm) ID plastic food grade

tubing between the large port of air/mix tee and
refrigerated mix transfer line. Secure with large hose
clamp or equivalent.

CAUTION

Risk of Product Damage
Air/mix Tee must remain below the black Cover/clamp.
If the Tee is above the pump, mix will drain to the air
compressor resulting in pump damage.

E. Plug mix pump into a 115 volt grounded receptacle.

WARNING

Hazardous Voltage
Remote mix pump must be plugged into a propely
grounded electrical receptacle. Do not alter the plug or
add a ground adapter plug. . Altering the plug to fit into
an outlet of different configuration may cause fire, risk
of electrical shock, product damage and will void the
warranty.

2.4 MIX PUMP CHECK OUT
Before using, the U3-02A Mix Pump should be thoroughly
cleaned. This is necessary to remove any foreign
materials that may be present.

A. The overrun adjustment is preset at the factory. If an

adjustment becomes necessary, refer to Section 4.1.

B. Check for air leaks by placing the suction line into

two gallons of cold water. Place the freezer switch in
the OFF position. Close the spigot and freezer air
bleed valve. Place mix pump switch in the ON
position and allow the system pressure to build up
and pump to shut OFF automatically. Leave the pump
on for ten minutes.

During this time, do not open spigot or freezer air
bleed valve. If pump does not automatically start
again during this period, the system is free of leaks.
If the pump does start, there is a leak in the system.
Locate leak by applying a liquid detergent or bubble
solution with a small brush to all tubing connections
and O-ring seals. Correct as required.

Figure 3

Mix Pump Installation

OPTIONAL
MOUNTING
KIT

Figure D

C. Connect 1/2 inch (1.27 cm) I.D. plastic food grade tubing to

the mix check valve and then to the mix container. Observe
check valve flow arrow. Secure with hose clamps.