support the removable door. (See Figure 9). Place 
jacket top panel over top side panels with ventilation 
louvers to the left. Secure top panel with four (4) #8 
x ½” long sheet metal screws provided.
e. Lift jacket bottom panel up to bottom of side panels
with front channel forward and ventilation louvers 
to the left. Secure bottom panel with four (4) #8 x 
½” long sheet metal screws provided.
f. Install jacket removable door. Hold door parallel
with top of door slightly above fl at top panel. Insert 
door between side panels. Lower door engaging 
top panel reverse bend and lower panel fl ange in 
the mating door fl anges. Door is now locked into 
position.
g. Reverse procedure to remove door.
8
INSTALL ROOM THERMOSTAT on an inside 
wall about four feet above fl oor. Never install 
thermostat on an outside wall or where it will be 
infl uenced by drafts, hot or cold water pipes, lighting 
fi xtures, television, rays of the sun or near a fi replace. 
Keep large furniture away from thermostat so there will 
be free movement of room air around this control.
Heat anticipator in thermostat should be set at .4.
9
ELECTRIC WIRING INSTALLATION.
See Figures 11 and 12 for applicable wiring 
diagram. A separate electrical circuit must be run 
from the main electrical service with an over-current 
device/disconnect in the circuit. A service switch is 
recommended and may be required by some local 
jurisdictions. The circuit should be run to the junction 
box mounted on the front of the boiler back plate in the 
control compartment (See Figure 1), and connected to 
the proper leads therein. Wires from the low voltage 
thermostat should be run to terminals R and G on 
the transformer. Install wiring and ground boiler in 
accordance with requirements of authority having 
jurisdiction, or in absence of such requirements the 
National Electrical Code, ANSI/NFPA 70.