Burnham SM-6 User Manual
Page 8
 
8
h. Secure boiler to boiler mounting wall bracket with
fi ve (5) ¼”-20 x ¾” long machine screws and 
washers provided.
NOTE: Tools required — 7/16” socket, extension
bar(s) and drive ratchet
i. Secure interior telescoping intake air duct to
back plate of boiler. Pull duct forward until duct 
and weld studs are engaged through 4½” x 5½” 
rectangular opening and holes in back plate. Make 
sure gasket is in place and fl at against back plate. 
Attach duct with four (4) ¼”-20 brass hex nuts, 
lockwashers and fl at washers.
3
INSTALLING EXTERIOR TELESCOPING 
INTAKE AIR DUCT (See Figures 4 and 5)
a. Position the exterior telescoping intake air duct into
wall penetration and insert duct inside interior duct 
already in place. Push duct inward until wall fl ange 
is against the wall, check for level and mark the four 
(4) ¼” diameter clearance holes for securing wall 
fl ange to exterior wall. Remove duct from wall.
Figure 4
VENT SYSTEM CROSS SECTION
Figure 5
EXPLODED BOILER ASSEMBLY