Assembly guide – Bowflex Sport Home Gym User Manual

Page 8

Advertising
background image

6

Step 3 - Attach the Squat Platform to the Main

Assembly

Locate the following items:

• From Step 2 - Base Platform/Lat Tower (Main) Assembly
Item #5 - Squat Platform
Item #I - (2) 3/8" X 3 1/4" Button Head Screws
Item #N - (4) 3/8" Washers
Item #O - (2) 3/8" Nylock Nuts
Item #Q - (4) Bolt Covers

With the Base Frame/Lower Lat Tower (Main)
Assembly (from Step 2) on the floor, carefully lift up the
front of the unit, then slide the Squat Platform (Rubber-
pad side down) underneath both Legs.

Line up the bolt holes in the brackets on the Squat
Platform with the bolt holes on each Leg (directly
behind the pulleys), as shown in Figure 3a.

Place (2) 3/8" Washers (Item #N) over the ends of (2) 3/8" X 3

1/4" Button Head Screws (Item #I) - one washer per screw.

Insert the screws through the lined-up holes as shown,

then place (2) 3/8" Washers and (2) 3/8" Nylock Nuts (Item

#O) over the end of each screw, securely tightening them in

place.

Completely tighten hardware installed during Step 3.

Place (2) Bolt Covers (Item #Q) over the Nylock Nuts installed

in this step - one cover per nut. Then, place (2) additional

Bolt Covers over the J-bolts, one cover per bolt, that attach

the Pulleys to the Leg, as shown in Figure 3b.

Figure 3b

Q

Figure 3a

O

5

Base Platform/Lower

Lat Tower Assembly

N

I

Squat

Platform

Brackets

Bolt

Holes

Leg

Assembly Guide

Advertising