Post operation procedure – Hale 2CBP User Manual

Page 20

Advertising
background image

Sec II- 8

Operating Procedures

Booster Pumps

POST OPERATION PROCEDURE

o

Return the engine to idle.

o

Slowly close all valves.

o

Place the transmission in neutral or park.

o

Slowly shift from "pump" to "road" to disen-
gage the pump.

o

Drain the pump (especially important in
freezing weather):

a. Open the discharge valves, remove
suction tube caps, and discharge valve caps.

b. Open the pump body drain cocks or Hale
multiple drain valve. If a multiple drain valve
is used, all pump drain lines should be
connected to this valve.

c. After the pump is completely drained,
replace all caps and close all valves,

o

If sea water, dirty water, alkaline water

or foam solution, has been used, flush the pump
with clean water.

o

Remove the wheel chocks only when

preparing to leave the scene.

o

Fill out the pump run log, indicating total

pumping time and total out-of-station time.

o

Report all pump, vehicle and equipment

malfunctions, and irregularities to the proper
authority.

o

Know and follow all local procedures.

Advertising
This manual is related to the following products:

CBP, AP