INSTALLATION AND DELIVERY CHECK LIST

After the CAFSAttack system is installed, use the following check list to ver-
ify installation and ensure proper system startup when the apparatus is
delivered to the end user.

Installation

Date

Initials

_______

_______

❑ CAFSAttack system is properly installed. See Section 4

“Installation - Retrofit Full Size Pumper” on page 25.

❑ Review previous Section 4.7 “Plumbing,” beginning on page

31.

❑ Review previous Section 4.8 “Electrical,” beginning on page

38.

❑ Also see heading “Start Up Check List” on page 46.

_______

_______

❑ FoamLogix system calibration and operation checked. See

separate manual provided.

❑ FoamLogix Model 2.1A Installation and Operation Manual,

Hale p/n: 029-0020-74-0

❑ FoamLogix Model 3.3 and 5.0 Installation and Operation Man-

ual, Hale p/n: 029-0020-68-0

Delivery

Date _______ Initials

_______

______

❑ DOT Air cylinders proper filled (charged).

_______

_______

❑ CAFSAttack shut-off valve is in the OFF (O) position (valve

handle in the horizontal position).

_______

_______

❑ CAFSAttack WET/DRY smart-switch presets set to end user

specification. See Section 5a.1, heading “Smart-Switch cali-
bration” on page 51.

_______

_______

❑ Proper CAFSAttack system operation demonstrated to end

user in accordance with manual procedures. See Section
5a.1, heading “Starting CAFSAttack” on page 54.

_______

_______

❑ End user trained in proper operation of the CAFSAttack sys-

tem in accordance with manual procedures. See Section 5a.1,
heading “Starting CAFSAttack” on page 54.

_______

_______

❑ Warranty registration card filled out by end user and mailed to

Hale Products Inc.

_______

_______

❑ Two copies of Installation and Operation manual provided to

end user.