❑ Start Up Check List

46

CAFS Bottled-Air Operator/s Guide

p/n: 029-0020-85-0

4.10

START UP CHECK LIST

Before energizing the apparatus and the CAFSAttack system for the first
time make sure the following items are checked:

Electrical

❑

Main cable harness connections are correct and tight. (See Figure 4-16:
“Primary CAFS Wire Harness,” on page 41.)

❑

All cables and wires are secured and protected from damage during
operation.

❑

Flow sensor cable properly connected to main cable harness (C1 and
C7).

❑

Control and flow sensor cables properly folded and secured; radio anten-
nas, power lines and equipment away from cables.

❑

The system is properly grounded using flat ground strap.

❑

Correct voltage provided. Direct current, negative (–) ground.

❑

Adequate current

, ?? AMPS

minimum, available. Main power direct to

battery, battery switch or solenoid without primer or other accessories
tied in.

❑

Primary electrical and ground connections tight and protected from cor-
rosion with silicone sealant.

❑

Splices in wires sealed from moisture using adhesive filled heat shrink
tubing.

Make sure the FoamLogix system is energized when either the CAFS-
Attack smart-switch WET or DRY button is pressed.

Air and Water

❑

All HIGH pressure air lines are the proper size and type and all connec-
tions are tight.

WARNING !

ONCE THE AIR CYLINDERS ARE FULLY CHARGED AND THE SYSTEM IS
ENERGIZED, ALL HIGH PRESSURE LINES BETWEEN THE CYLINDER SHUT-
OFF VALVES AND THE PRESSURE BALANCING REGULATOR VALVES ARE
EXPOSED TO HIGH PRESSURE (4,500 PSI / 310 BAR).