Fluid Management NSC80 Harbil User Manual

Page 7

Advertising
background image

NSC80 Operating & Instruction Manual

7

ASSEMBLY & INSTALLATION

1/8 to 1/4


5. Lower the canister into position, assuring that the agitation crank is

captured by the nylon bushing and that the screw heads pass through the
button holes, as shown in figure 3-A. Rotate canister clockwise locking
it into place as shown in Figure 3-B.

NOTE: The dispense port will fall through its hole, and the canister will sit flat on

the turntable.

6. While holding canister in position, secure the canister to the turntable

using a screwdriver. Access holes are provided at the bottom of the
turntable to tighten the two screws. (Figure 4 on page 8) Do not
overtighten these screws.

1/4”- 20

CANISTER
MOUNTING
HOLES

CANISTER

AGITATION
CRANK

1/8”- 1/4”

BOTTOM
VIEW

Figure 2 CANISTER

7. Verify that the agitation crank is engaged by the nylon drive star

bushing. This is done by turning the agitation blade inside the canister.
Resistance to turning indicates that the agitation rod is engaged. If the
agitation blade turns freely, the agitation rod is not engaged and the
canister must be re-mounted.




IF AGITATION
BLADE MOVES
BY HAND, THE
CRANK IS NOT
CAPTURED BY
BUSHING.

ROTATE CLOCK-WISE
TO LOCK CANISTER
INTO PLACE.




(A )

(B )

BUTTO N
HOLE

Figure 3 BUTTON HOLE MOUNTING

Advertising