Fluid Management NSC80 Harbil User Manual

Page 8

Advertising
background image

Fluid

na

nt

8

ASSEMBLY & INSTALLATION


8. After installing the first canister, lower the index lever and rotate the

turntable to the next position.

9. Repeat steps 3-6 for each of the remaining canisters until all are

installed.

10. After completing canister assembly, connect machine to power, and turn

on the agitation switch. Verify that all the agitation blades are turning
properly.















































Figure 4 SECURING CANISTER

Advertising