Section 2 - pre-operation and inspection, 1 pre-operation check and inspection, 1 pre-operation check and inspection -1 – JLG Telehandler Personnel Work Platform User Manual

Page 21: Warning

Advertising
background image

Section 2 - Pre-Operation and Inspection

2-1

31200160

SECTION 2 - PRE-OPERATION AND INSPECTION

2.1

PRE-OPERATION CHECK AND INSPECTION

Note: Complete all required maintenance before operating unit.

A pre-operation check & inspection of the telehandler is to be completed first. Refer
to the Operation & Safety Manual supplied with telehandler.

The pre-operation check & inspection, performed at beginning of each work shift or
at each change of operator, should include the following:

1. Cleanliness - Check all surfaces for foreign objects.

2. Structure - Inspect the platform structure for dents, damage, weld or parent

metal cracks or other discrepancies.

3. Safety Decals - Ensure all safety decals are legible and in place. Clean or

replace as required. See page 2-2 for details.

4. Operation & Safety Manual - Operation & Safety manual located in platform

manual holder.

5. Walk-Around Inspection - See page 2-5 for details.

6. Operational Check - Once the walk-around inspection is complete, perform a

warm-up and operational check (see page 2-6) in an area free of overhead and
ground level obstructions.

WARNING

FALL HAZARD. Use extreme caution when checking items beyond your normal
reach. Use an approved ladder.

WARNING

If the telehandler does not operate properly, immediately bring machine to a stop,
lower boom and platform to ground and stop engine. Determine cause and
correct before continued use.