3.36

534D-9, 534D-10 & 544D

adjustment required. The correct dimension is 17 in
(432 mm).

8. Loosen the adjusting nut (6) at the top front of the

second boom section enough to permit adjustment.

9. Loosen the retract chain jam nut (7) at the bottom

front of the second boom section.

10. Tighten the retract chain adjusting nut to obtain the

17 in (432 mm) dimension.

11. Torque the jam nuts to 100 lb-ft (135 Nm). DO NOT

use Loctite

®

on the nuts.

12. Readjust the extend chains as described in Section

3.12.3, “Adjusting Extend Chains.”

3.12.5

Retract Chain Removal

The following section explains the removal of the 1 in
(25 mm) retract chains from the third to first boom
sections without removing the boom assembles.

1. Fully retract the boom and raise the boom to a

horizontal position making sure that the chains are
accessible through the front access holes. Place the
transmission control lever in (N) NEUTRAL, engage
the park brake switch. Shut off machine.

2. Attach a suitable sling to the extend/retract cylinder

and take the weight off the extend/retract cylinder.

3. Remove the cylinder pin from the rod end of the

extend/retract cylinder and lower the cylinder free of
the boom. Lowering the extend/retract cylinder will
allow access to the chains.

4. Remove tension from the chain by backing off the

jam nut and adjusting nut (8).

5. Remove the four bolts (9) from the chain adjustment

block.

6. Remove the chain from the clevis (10) at the block.

7. Install a nylon tie-wrap through the in the removed

chain, making a loop with the tie-wrap and tie a rope
to the loop.

8. Move to the back of the boom and pull the chain to

the rear to allow slack for removal.

9. Remove the chain from the clevis and drop it free

from the boom.

10. Holding the rope at the front adjustment block,

carefully pull the chain out through the back of the
boom until it’s free.

11. Untie the rope and leave it in place for reinstallation

of the chain.

The following section explains the removal of the 3/4 in
(19 mm) retract chains from the fourth to second boom
sections without removing the boom assembles.

1. Remove the jam nut (11) from the chain clevis

installed in the chain adjustment block.

2. Back off the adjusting nut fully on the chain clevis.

DO NOT remove the nut from the clevis.

3. Remove the chain from the clevis, install a nylon tie-

wrap through the holes in the chain, making a loop
with the tie-wrap and tie a rope to the loop.

4. Move to the back of the boom and pull the chain to

the rear to allow slack for removal.

5. Remove the chain from the clevis and drop it free

from the boom.

6. Holding the rope at the front, carefully pull the chain

out through the back of the boom until it’s free.

7. Untie the rope and leave it in place for reinstallation

of the chain.

3.12.6

Retract Chain Installation

Inspect and lubricate chains thoroughly before
installation. Articulate the chains to make sure all working
surfaces are thoroughly lubricated.

Note: Install the 3/4 in (19 mm) chain first.

1. Fasten a rope to the end of the 3/4 in (19 mm) chain

in order to pull it back into the boom.

2. Attach the chain to the chain clevis at the rear of the

fourth boom section.

3. Carefully pull the chain into the boom until it can be

fastened to the chain clevis.

4. Remove the rope.