ARB RD119 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

6

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

9

3.1

Installing the Carrier Bearings

9

3.2

Re-Mounting the Ring Gear

10

3.3

Drilling and Tapping the Bulkhead Port

11

3.4

Checking for Assembly Clearance

12

3.5

Checking the Backlash

15

3.6

Assembling the Seal Housing

17

3.7

Profiling the Seal Housing Tube

19

3.8

Setting Up the Bulkhead Fitting

20

3.9

Bench Testing the Air Locker

22

3.10

Reinstalling the Differential and Axles

23

4 Installing the Air System

24

4.1 Mounting the Solenoid

24

4.2 Running & Securing the Air Line

26

4.3 Connection to the Bulkhead Fitting

27

5 Mounting & Connecting the Electrical System

29

5.1 Mounting the Actuator Switch(es)

29

5.2 Wiring the Actuator System

30

6 Testing & Final Assembly

34

6.1 Leak Testing

34

6.2 Testing the Air Locker Actuation

35

6.3 Re-Sealing & Filling the Differential

35

6.4 Post-Installation Check List

36

7 Parts List

37

7.1 Exploded Assembly Diagram

37

7.2 Itemized Parts List

38

Advertising