ARB RD114 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

6

2.4 Marking the Bearing Caps

6

2.5 Checking the Current Backlash Amount

7

2.6 Removing the Differential Carrier

8

3 Installing the Air Locker

9

3.1

Re-Mounting the Ring Gear

9

3.2

Assembling the Seal Housing

10

3.3

Installing the Carrier Bearings

11

3.4

Drilling and Tapping the Bulkhead Port

12

3.5

Checking for Assembly Clearance

13

3.6 Final Air Locker Assembly

14

3.7

Checking the Backlash

15

3.8

Profiling the Seal Housing Tube

16

3.9

Setting Up the Bulkhead Fitting

17

3.10

Reinstalling the Differential and Axles

19

4 Installing the Air System

20

4.1 Mounting the Solenoid

20

4.2 Running & Securing the Air Line

22

4.3 Connection to the Bulkhead Fitting

23

5 Mounting & Connecting the Electrical System

25

5.1 Mounting the Actuator Switch(es)

25

5.2 Wiring the Actuator System

26

6 Testing & Final Assembly

30

6.1 Leak Testing

30

6.2 Testing the Air Locker Actuation

31

6.3 Re-Sealing & Filling the Differential

31

6.4 Post-Installation Check List

32

7 Parts List

33

7.1 Exploded Assembly Diagram

33

7.2 Itemized Parts List

34

Advertising