ARB RD145 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

2 Removing the Existing Differential

5

2.1 Vehicle Support

5

2.2 Differential Fluid Drain

5

2.3 Removing the Axles

6

2.4 Marking the Bearing Caps

6

2.5 Removing the Differential Carrier

7

3 Installing the Air Locker

8

3.1

Re-Mounting the Ring Gear

8

3.2

Assembling the Seal Housing

10

3.3

Installing the Carrier Bearings

11

3.4

Drilling and Tapping the Bulkhead Port

12

3.5 Final Air Locker Assembly

13

3.6

Profiling the Seal Housing Tube

14

3.7 Setting Up the Bulkhead Fitting

15

3.8 Bench Testing the Air Locker

17

3.9 Reinstalling the Differential and Axles

17

4 Installing the Air System

18

4.1 Mounting the Solenoid

18

4.2 Running & Securing the Air Line

20

4.3 Connection to the Bulkhead Fitting

21

5 Mounting & Connecting the Electrical System

23

5.1 Mounting the Actuator Switch(es)

23

5.2 Wiring the Actuator System

24

6 Testing & Final Assembly

27

6.1 Leak Testing

27

6.2 Testing the Air Locker Actuation

28

6.3 Filling the Differential

28

6.4 Post-Installation Check List

29

7 Parts List

31

7.1 Exploded Assembly Diagram

31

7.2 Itemized Parts List

32

Advertising