2000w generator, Operation (cont’d) – Steele Products SP-GG200D User Manual

Page 20

Advertising
background image

20

2000W Generator

Operation (cont’d)

Powering 12 Volt DC tools and Equipment:

1. Prior to powering tools and equipment, make sure the generator’s rated voltage, and amperage

capacity (12V/DC @ 8.3 AMPs) is adequate to supply all electrical loads that the unit will
power. If powering exceeds the generator’s capacity, it may be necessary to group one or more
of the tools and/or equipment for connection to a separate generator.

2. Connect the power cord of a 12V DC powered tool or equipment to the DC Terminals.

3. Start and run the engine as described above

4. When finished using the generator, turn the fuel valve to its “OFF” position. Turn

the fuel valve to its “OFF” position.

5. Disconnect the electrical powered tools’ power cord from the generator’s DC terminals.

6. After the engine and generator have completely cooled, store the generator in a safe, clean, dry

location (if not already installed in one).

Advertising