Installation instruc tio ns – Poison Spyder LJ FULL CAGE KIT User Manual
Page 3

INSTALLATION INSTRUC
TIO
NS
Poison Spyder Customs • LJ FULL CAGE KIT INSTALL
Page 3
©2013 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM
3. Install the B-Pillar Mount Plates L&R
2
in the locations where the main hoop of the
factory roll bar bolted in, just behind the door
opening on either side. Re-use the factory
hardware.
FIGURE 3
4. Install the C-Pillar Mount Plates L&R
3
where the factory roll bar bolted in at the rear
corners. Orient the plates with the rounded
point edge facing the rear of the Jeep.
Secure them using the OE hardware.
FIGURE 4
5. Weld the gusset seam on each of the
Lower A-Pillars L&R
5
. This seam was left
un-welded so that you may weld it to match
the weld style of the rest of your cage. For
instance, if you are TIG welding your cage,
you would likely prefer to have your own TIG
weld in such a highly visible spot as this.
5
9
8
2
3
10
15
13
12
11
16
6
7
1
17
14