Installation instruc tio ns – Poison Spyder LJ FULL CAGE KIT User Manual
Page 4

INSTALLATION INSTRUC
TIO
NS
Poison Spyder Customs • LJ FULL CAGE KIT INSTALL
Page 4
©2013 POISON SPYDER CUSTOMS, INC. • 951-849-5911 • WWW.POISONSPYDER.COM
FIGURE 5
6. Install the Lower A-Pillars L&R
4
. Bolt
each Lower A-Pillar into place using the
three Torx bolts you removed during Step 5
of the Factory Cage Removal process. Note
that once installed, the Lower A-Pillars will
NOT be oriented perpendicular to the Jeep.
They will angle slightly inward. Be sure to
test-fit the doors for proper closing, before
proceeding.
FIGURE 6
7. Install the Main Side Hoops L&R
6
, one
side at a time. Have a friend hold the Main
Side Hoop in place with the front portion
of the tube in contact with the Windshield
Mount Plate, with the tube end centered on
the plate. Hold the rearward end of the tube
so that it lands centered within the curved-
point area of the C-Pillar Mount Plate. Tack-
weld the Main Side Hoop to each plate
FIGURE 7
8. Install the B-Crossbar
12
between the two
Main Side Hoops. Reference the laser-
etched markings to correctly locate the
C-Crossbar along the inner side of each
Main Side Hoop.
FIGURE 8
9. Install the B-Pillars L&R
8
between the
B-Pillar Mount Plate and the Main Side Hoop
on either side. Reference the laser-etched
markings to correctly locate the B-Pillar tube
along the Main Side Hoop. Tack the B-Pillar
into place.
FIGURE 9
10. Install the A-Crossbar
10
and the Forward
Stringers L&R
11
at the same time. Have
a friend help with holding the three pieces