Synergy 5205 - TJ/LJ Cage Tie-In Kit User Manual

Page 2

Advertising
background image


3)

With holes drilled in the tub, bolt up the bushing mount bracket and bushing under
the floor of the Jeep. Tighten all 4 3/8” bolts to locate the bushing in its final place.
Use a washer under both the bolt head and the nylock nuts provided in the kit.

4)

With bushing mount bracket secured in place, begin fitting cage tie in tubes.

5)

Start by tacking frame plate in place.

a. Use the tie in tube as a guide to determine frame plate location.
b. Next, fit tube in place and tack to the bushing side only. Securely tack the

tube to the bushing, being careful not to melt the bushing. (**NOTE**
This kit comes pre notched / fitted for our TJ / LJ cage. If installing into a
YJ, grind off approximately 3/8” from the cut edge and fit accordingly as
shown in Pic 5.1b

Advertising