Synergy 5205 - TJ/LJ Cage Tie-In Kit User Manual

Page 3

Advertising
background image

Picture 5.1b

6)

Remove the tube / bushing assembly from the Jeep

7)

Remove the sleeve and bushings from the bushing tube and fully weld the frame
tube to the bushing tube. (**NOTE** this is a good time to paint the tube assembly
as to reach all sides of the tube to prevent rusting. Just mask off the frame end for
final welding)

8)

Reinstall bushings and reinstall welded tube assembly back into the bushing mount
bracket.










9)

Fully weld as shown below.

Advertising