Relief valves, 4 pressure setting procedures, Bang-bang main relief valve – JLG 460SJ ANSI Service Manual User Manual

Page 307: Steer, Platform level up, Platform level down, Articulating jib up, Relief valves -17, Pressure setting procedures -17

Advertising
background image

SECTION 5 - HYDRAULICS

3120788

– JLG Lift –

5-17

Relief Valves

Relief valves are installed at various points within the
hydraulic system to protect associated systems and com-
ponents against excessive pressure. Excessive pressure
can be developed when a cylinder reaches its limit of
travel and the flow of pressurized fluid continues from the
system control. The relief valve provides an alternate path
for the continuing flow from the pump, thus preventing
rupture of the cylinder, hydraulic line or fitting. Complete
failure of the system pump is also avoided by relieving cir-
cuit pressure. The relief valve is installed in the circuit
between the pump outlet (pressure line) and the cylinder
of the circuit, generally as an integral part of the system
valve bank. Relief pressures are set slightly higher than
the load requirement, with the valve diverting excess
pump delivery back to the reservoir when operating pres-
sure of the component is reached.

1.Remove the boom from the turntable as follows:

a. Disconnect wiring harness from ground control

harness connector.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF CON-
TAMINANTS INTO SYSTEM.

b. Tag and disconnect hydraulic lines from boom

to control valve. Use a suitable container to
retain any residual hydraulic fluid. Cap all
hydraulic lines and ports.

c. Using a suitable lifting equipment, adequately

support boom weight along entire length.

d. Remove the bolts and keeper pins securing the

lift cylinder pivot pin. Using a suitable brass drift
and hammer, remove the pivot pin from the
lower boom.

e. Remove hardware securing the level link pivot

pin. Using a suitable brass drift and hammer,
remove the pin from the level link and turntable.

f. Remove hardware securing the boom pivot pin.

Using a suitable brass drift and hammer, remove
pin from the turntable.

Using all applicable safety precautions, carefully lift boom
assembly clear of turntable and lower to ground or suit-
able supported work surface.

5.4 PRESSURE SETTING PROCEDURES

Cold temperatures have a significant impact on pressure
readings.JLG Industries Inc. recommends operating the
machine until hydraulic system has warmed to normal
operating temperatures prior to checking pressures. We
also recommend using a calibrated gauge. Pressure read-

ings are acceptable if within +/- 5% of specified pres-
sures.

NOTE: Engine RPM’s must be correct. Mid engine 1800,

and High engine 2800 for Deutz engines; 2900 for
Ford engines. The adjustable resistor at the ground
control for lift and swing should be set to maximum
speed for these functions while setting pressures.
After this procedure is done, it can be reset.

1. Bang-Bang Main Relief Valve;

This valve will be reset at the end of this procedure. In
order to be able to set other pressures, we need to set this
valve to 3000 psi. Install a high pressure gauge at the port
marked “M1” located behind the tank port. Activate tele-
scope in. Adjust the valve to 3000 psi, located on top of
main valve, 3

rd

relief valve to the left of the tank port. Turn

clockwise to increase and counterclockwise to decrease.

2. Steer;

Install a high pressure gauge at the port marked “M5”.
Activate steer and adjust the relief valve to 2500 psi. The
relief valve is located on the top of the main valve, the 5

th.

relief valve down from the tank port. Turn clockwise to
increase and counterclockwise to decrease.

3. Platform Level Up;

Install a high pressure gauge at the port marked “M3,
located on the front face of the block at the top right cor-
ner. There is pressure trapped at this test port. To release
this pressure, activate level down to the end of stroke. (the
pressure in the up side goes to 0) This will allow you to
snap a gauge on this port. Activate level up to the end of
stroke, you should read 2800 psi. The level up relief valve
is located on the top of the main valve and is the 1

st.

relief

valve to the left of the tank port. Turn clockwise to
increase, and counterclockwise to decrease.

4. Platform Level Down;

Install a high pressure gauge at the port marked “M4,
located at the front face, bottom right corner. To get a
gauge on this point, activate level up to the end of stroke,
(the pressure in the down side goes to 0)allowing you to
snap on a gauge. Activate level down to the end of stroke,
you should read 1800 psi. The level down relief valve is
located on the top of the main valve and is the 2

nd.

relief

valve to the left of the tank port. Turn clockwise to
increase, and counterclockwise to decrease.

5. Articulating Jib Up;

Install a high pressure gauge on “M” port of jib block,
located on the left side of the main valve. Activate jib up,
reading should be 2500 psi. The up relief valve is the front

Advertising
This manual is related to the following products: