Resistance measurement, Continuity measurement, Resistance measurement -2 – JLG 460SJ ANSI Service Manual User Manual

Page 406: Continuity measurement -2

Advertising
background image

SECTION 7 - BASIC ELECTRICAL INFORMATION & SCHEMATICS

7-2

– JLG Lift –

3120788

Resistance Measurement

•First test meter and leads by touching leads

together. Resistance should read a short circuit
(very low resistance)

•Circuit power must be turned OFF before testing

resistance

•Disconnect component from circuit before testing
•If meter is not auto ranging, set it to the correct

range (See multimeter’s operation manual)

•Use firm contact with meter leads

Continuity Measurement

•Some meters require a separate button press to

enable audible continuity testing

•Circuit power must be turned OFF before testing

continuity

•Disconnect component from circuit before testing

•Use firm contact with meter leads

•First test meter and leads by touching leads

together. Meter should produce an audible alarm,
indicating continuity

Figure 7-2. Resistance Measurement

Figure 7-3. Continuity Measurement

Advertising
This manual is related to the following products: