Hub-spindle sub-assembly, Hub-spindle sub-assembly -13 – JLG 460SJ ANSI Service Manual User Manual

Page 67

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120788

– JLG Lift –

3-13

7. With the large end down, place the disconnect cap

(6D) onto the cover cap (6B), aligning the pipe plug
hole in the disconnect cap over the pipe plug hole in
the cover cap.

8. Place the two remaining bolts (6C) into the bolt

holes in the disconnect cap (6D), and tighten the
bolts.

9. Using a torque wrench, apply 36 to 49 in. lbs. (4 to 5

Nm) of torque to both bolts (6C).

10. Apply a light coat of "Never-Seize" to pipe plug (6H)

and tighten it into the pipe plug hole in the cover
(6A).

Hub-Spindle Sub-Assembly

NOTE: Make sure the cup sits square with the counterbore

before pressing.

1. Set hub (1G) onto its large end. Press bearing cup

(1C) into the counterbore in the small end of the hub
(1G).

2. Press the nine studs (1N) into the stud holes in hub

(1G).

Advertising
This manual is related to the following products: