Quick change platform mount -8 – JLG 15AMI Operator Manual User Manual

Page 46

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-8

– JLG Lift –

3121212

2. Swing the platform lower support rail into the lower plat-

form mount on the mast.

3. Secure the platform support rails with the two (2) platform

upper mount pins, and the two (2) lower platform mount
pins.

The platform is now ready for operation.

Figure 4-5. Quick Change Platform Mount.

1. Platform Upper Mount
2. Platform Lower mount

3. Upper Mount Pins
4. Lower Mount Pins

2

1

3

4

Advertising