JLG 3246E2 Operator Manual User Manual

Page 19

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3120854

– JLG Lift –

2-7

GENERAL

Begin the “Walk-Around Inspection” at Item 1, as noted
on the diagram. Continue Left (counterclockwise viewed
from top) checking each item in sequence for the condi-
tions listed in the following checklist.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS
“OFF” DURING “WALK-AROUND INSPECTION”.

DO NOT OVERLOOK VISUAL INSPECTION OF CHASSIS UNDER-
SIDE. CHECKING THIS AREA OFTEN RESULTS IN DISCOVERY
OF CONDITIONS WHICH COULD CAUSE EXTENSIVE MACHINE
DAMAGE.

NOTE: On each item, make sure there are no loose or

missing parts, that they are securely fastened, and
that no visible damage exists in addition to any
other criteria mentioned.

1.

Platform Control Console - Placard secure and leg-
ible, control lever and switches return to neutral,
control lever lock and emergency stop switch func-
tion properly, manual in storage box.

2.

Spindle, Tie Rod and Steer Linkage (left front) - See
Note

3.

Safety Prop - See Note

4.

Sizzor Arms and Sliding Wear Pads - See Note

5.

Drive Motor, Left Front - See Note

6.

Wheel and Tire Assembly, Left Front - See Note

7.

Drive Cutout Switch - See Note

8.

Compartment Cover and Latches - See Note

9.

Ground Controls - Placard secure and legible, con-
trol switches return to neutral position, emergency
stop switch functions properly. Control markings
legible.

10.

Hydraulic Reservoir - Recommended hydraulic
fluid level on level indicator on tank. Breather cap
secure and working.

11.

Hydraulic Filter - See Note

12.

Hydraulic Pump/Motor - See Note

13.

Pothole Protection System - See Note

14.

Hourmeter - See Note

15.

Wire Installation - See Note

16.

Wheel and Tire Assembly, Left Rear - See Note

17.

Sizzor Arms and Sliding Wear Pads - See Note

18.

Manual Descent - See Note

19.

Brake Cylinder - See Note

20.

Ladder - See Note

21.

Control Valve Installation - No unsupported wires or
hoses; no damaged or broken wires.

22.

Sizzor Arms and Sliding Wear Pads - See Note

23.

Wheel and Tire Assembly, Right Rear - See Note

24.

Lift Cylinder - See Note

25.

Tilt Switch - See Note

26.

Battery Compartment - Proper electrolyte level

27.

Pothole Protection System - See Note

28.

Battery Charger - See Note

29.

Compartment Cover and Latches - See Note

30.

Wheel and Tire Assembly, Right Front - See Note

31.

Drive Motor, Right Rear - See Note

32.

Platform/Handrail Installation (Not Shown) - See
Note

33.

Sizzor Arms and Sliding Wear Pads - See Note

Figure 2-2. Daily Walk-Around Inspection - 1932E2 (Sheet 2 of 2).

Advertising