17 shut down and park, 17 shut down and park -26 – JLG T500J Operator Manual User Manual

Page 80

Advertising
background image

SECTION 5 - MACHINE OPERATION

5-26

– JLG Lift –

3121197

6.

Pull out on the drive & set control valve knob. Ensure friction
wheels are disengaged from tires.

7.

The machine is now ready for towing. Refer to Section 3,
TOWING
.

5.17

SHUT DOWN AND PARK

To shut down and park the machine, the procedures are as fol-
lows:

1.

Transport the machine to a reasonably well protected area.

2.

Ensure boom is stowed with platform over hitch. Secure the
boom with the transport latch.

3.

Push in the Emergency Stop at Platform Controls.

4.

Push in the Emergency Stop at Ground Controls. Position
Platform/Ground Select switch to center OFF.

5.

If necessary, cover Platform Controls to protect instruction
placards, warning decals and operating controls from hostile
environment.

6.

Set parking brake and uncouple from towing vehicle.

Advertising
This manual is related to the following products: