SECTION 2 - PROCEDURES

2-12

– JLG Lift –

3120743

2.8

BOOM MAINTENANCE.

Removal. (Model 30)

1.

Remove the platform/support as follows:

a. Disconnect electrical cable from control con-

sole.

b. Using an overhead crane or suitable lifting

device, strap support the platform/support.

c. Remove hardware from pin #1. Using a suitable

brass drift and hammer, remove pin #1 from the
platform support.

d. Supporting the platform/support, remove the

hardware from pin #2. Using a suitable brass
drift and hammer, remove pin #2 from the fly
boom and remove the platform.

2.

Remove the boom from upright as follows:

a. Remove hardware securing the hose clamp to

the ba se boom section an d remove hose
clamps. Pull wiring harness through the aft end
of the base boom section.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF
CONTAMINANTS INTO SYSTEM.

b. Using a suitable lifting equipment, adequately

support boom link weight along entire length.

c. Remove hardware securing the upper link pin

#1. Using a suitable brass drift and hammer,
remove pin #1 from the upright and remove
upper link.

d. Using a suitable lifting equipment, adequately

support boom weight along entire length.

e. Remove hardware securing the lift cylinder pin

#2. Using a suitable brass drift and hammer,
remove pin #2 from the base boom.

f.

Remove hardware securing the base boom pin
#3. Using a suitable brass drift and hammer,
remove pin #3 from the upright.

Figure 2-3. Location of Components - Platform

Support (Model 30).

Figure 2-4. Location of Components - Removal of Base

Boom. (Model 30)