JLG 45e ANSI Service Manual User Manual

Page 70

Advertising
background image

SECTION 2 - PROCEDURES

2-46

– JLG Lift –

3120743

Assembly.

7.

Clean all parts thoroughly.

8.

Reverse disassembly procedure above, taking par-
ticular care with the assembly sequence of plates (5,
6, 7).

NOTE: Assemble plate (6) with two center-punches facing

towards mounting plate (4).

9.

If new plates have been fitted, then new spacers will
have to be adjusted for air gap of 0.014 - 0.024
inches (0.35 - 0.60 mm) as shown in Figure 2-35.

10.

After checking air gap, connect power supply.

11.

Switch on power supply and ensure brake fully
releases.

12.

The brake can be adjusted for friction plate wear by
removing spacers (8) and machining them to main-
tain the correct air gap. Length of all three spacers
should be within 0.001 in. (0.025 mm).

Advertising