4 road operation (2505h), 4 road operation (2505h) -10 – JLG 2505H Operator Manual User Manual

Page 74

Advertising
background image

Section 4 - Operation

4-10

31200743

4.4

ROAD OPERATION (2505H)

1. Preparation

a. Remove load from attachment.

b. Remove any large amounts of dirt from machine.

c. Check lights and mirrors and adjust if necessary.

Note: Be sure to follow all local and federal/provincial traffic regulations.

2. Lower boom. Lowest part of attachment should be approximately 12 in (30 cm)

above the ground.

3. Fully tilt attachment back.

4. Place protective shield over front bucket edge: remove or reposition carriage

forks toward the machine and secure to the carriage.

5. Change steer mode to front wheel steering (1). See “Steer Mode Change” on

page 3-20.

6. Activate road use operation switch (2) to lock steer mode and joystick controlled

functions.

7. Machine is now ready for road operation.

OAL2070

2 1

Advertising
This manual is related to the following products: