7 wear pads, 8 boom maintenance, Wear pads -10 – JLG 45e Service Manual User Manual

Page 36: Boom maintenance -10

Advertising
background image

SECTION -

-10

– JLG Lift –

3120861

2.7

WEAR PADS.

Main Boom. (Models 35/n35/40/n40/45)

1.

Shim up wear pads until snug to adjacent surface.

2.

Replace wear pads when worn to thickness shown
in Figure 2-2.

3.

Adjust wear pads as follows:

a. a. Loosen jam nut on adjustment bolt, turn bolt

CW until wear pad is snug to adjacent surface.

b. b.After adjustments have been made, tighten the

jam nuts on wear pad bolts.

2.8

BOOM MAINTENANCE.

Removal. (Model 30)

1.

Remove the platform/support as follows:

a. Disconnect electrical cable from control con-

sole.

b. Using an overhead crane or suitable lifting

device, strap support the platform/support.

c. Remove hardware from pin #1. Using a suitable

brass drift and hammer, remove pin #1 from the
platform support.

d. Supporting the platform/support, remove the

hardware from pin #2. Using a suitable brass
drift and hammer, remove pin #2 from the fly
boom and remove the platform.

2.

Remove the boom from upright as follows:

a. Remove hardware securing the hose clamp to

the base boom section a nd remove hose
clamps. Pull wiring harness through the aft end
of the base boom section.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDI-
ATELY AFTER DISCONNECTING LINES TO AVOID ENTRY OF
CONTAMINANTS INTO SYSTEM.

b. Using a suitable lifting equipment, adequately

support boom link weight along entire length.

Figure 2-2. Location and Thickness of Wear Pads.

Figure 2-3. Location of Components - Platform

Support (Model 30).

Advertising