Assembly, 10 footswitch adjustment, 11 boom limit switches – JLG M400 ANSI Service Manual User Manual

Page 126: Assembly -10, Footswitch adjustment -10, Boom limit switches -10, Platform support torque values -10

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-10

– JLG Lift –

3121125

Assembly

NOTE: For location of components See Section 4-7., Loca-

tion of Components - Articulating Jib Boom.

1. Align lift cylinder, rotator support top tube holes, and

top tubes. Using a soft head mallet, install cylinder
pin #6 into articulating jib boom and secure with
mounting hardware.

2. Align bottom tubes with attach holes in rotator sup-

port. Using a soft head mallet, install rotator support
pin #5 into articulating jib boom and secure with
mounting hardware.

3. Align articulating jib boom with attach hole in articu-

lating jib boom pivot weldment. Using a soft head
mallet, install rotator support pin #4 into articulating
jib boom and secure with mounting hardware.

4. Align bottom tubes with attach holes in articulating

jib boom pivot weldment. Using a soft head mallet,
install rotator support pin #3 into articulating jib
boom pivot weldment and secure with mounting
hardware.

5. Align articulating jib boom pivot weldment with

attach holes in fly boom assembly. Using a soft head
mallet, install pivot pin #2 into fly boom assembly
and secure with mounting hardware.

6. Align the slave leveling cylinder with attach holes in

articulating jib boom pivot weldment. Using a soft
head mallet, install slave leveling cylinder pin #1
into articulating jib boom pivot weldment and secure
with mounting hardware.

4.10 FOOTSWITCH ADJUSTMENT

Adjust switch so that functions will operate when pedal is
at center of travel. If switch operates within last 1/4 inch
(6.35 mm) of travel, top or bottom, it should be adjusted.

4.11 BOOM LIMIT SWITCHES

Refer to Figure 4-10., Boom Limit Switches for adjust-
ments to be made to the two Boom Limit Switches which
bolt in place on the upright.

A,B,D

C,D

A
B
C
D

Torque to 50 ft.lbs. (68 Nm)
Loctite #242
Torque 250-270 ft. lbs. (339-366 Nm)
Check torque every 150 hours of operation

Figure 4-9. Platform Support Torque Values

NOTE: If any rotator bolts are replaced, all bolts

on the rotator should be retorqued.

Advertising
This manual is related to the following products: